START A STIMULATION PROGRAMME
Before beginning any stimulation programme, you must turn the modules on.
To turn on the modules, press their respective On/Off button. As soon as the module is turned on, its
battery level appears on the screen. Turn on the number of modules desired according to the electrode
placement selected. As soon as a sufficient number of modules is turned on, a small arrow appears on
the right of the screen.
If the MI-scan function is activated, the programme starts with a short sequence during which
measurements are taken. For the duration of the measurement test, it is important to stand still and be
perfectly relaxed. Once the test is completed, the programme can start. Stimulation always starts at 000.
A
F
E
B
C
A
B
A Contraction phase
B Warm up phase
G
C Active rest phase
D Relaxation phase
D
E Number of contractions performed / Total number of contractions
F Indication of the active MI function
G Pop-up help indicating information or actions to be taken
A Return to the previous step
B Confirm your selection and start the
programme
EN
20