Preparation For Use - SKF TIH L Mode D'emploi

Masquer les pouces Voir aussi pour TIH L:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18

4. Preparation for use

Place the TIH L in the horizontal position on a stable surface.
Assemble the bearing support with the supplied bolts.
Connect the mains plug to a suitable mains supply.
Plug the remote control into the connector on the heater electrical cabinet.
Slide the sliding yoke in open position. See the illustrations at the beginning of
this manual.
For workpieces heated over the sliding yoke, follow these steps:
- Lift the workpiece over the heater operating area using appropriate lifting
equipment.
- Slide the yoke through the workpiece bore diameter.
- Close the sliding yoke so that it completely covers the top of both vertical supports
For workpieces heated around the induction coil, follow these steps:
- Place the workpiece over the induction coil using appropriate lifting equipment.
- For best performance, adjust the position of the workpiece so that the induction
coil is in the centre.
- Close the sliding yoke so that it completely covers the top of both vertical supports.
If you will use TEMP MODE, plug the temperature probe into its socket on the heater
electrical cabinet. Place the magnetic end of the probe on the inner ring of the
bearing or on the innermost surface of the workpiece.
Switch on the TIH L with the main switch of the heater electrical cabinet
Observe the self-test of the remote control display and signal tone.
10
SKF TIH L

Publicité

Table des Matières
loading

Table des Matières