Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

IEI
Install 4 ea. columns (1) and pull tight with box-end spanner (6) from your hardware bag.
Locate first rack panel over columns. Slip 4 ea. clamping sleeves (3) over column (1) and
secure with wingbolt (4) (wingbolts must be adjusted vertically to the outer edge of the
platform).
Column (1) features vor marks for clamping sleeve (3) offest A, B, C and 3D.
3 ea. racks for 25 ml Erlenmeyer flask: A & D marks
2 ea. racks for 50 ml Erlenmeyer flasks: B mark
2 ea. racks for 100 ml Erlenmeyer flasks: C mark
2 ea. racks for 250 ml Erlenmeyer flasks: D mark
Install second rack over column (1) and seat on clamping sleeve (3).
Install 3rd rack (if required) by repeating above steps.
Before starting shaking, make sure all vessels are securely held by their clamping
brackets and all bolts have been pulled tight.
Before connecting power cord with mains outlet, make sure that:
your item is wired for your local voltage and frequency (data plate on
-
item).
master switch is set to "0" and all controls are in "min." position (turn
-
CCW completely); this way you avoid spilling fluids by too intense
shaking action.
Carefully close your vessels and select appropiate shaking intensity (if
flasks remain opern) to avoid splashes and spillage.
We recommend starting with low shaking speed and gradually increase
frequency to avoid accidential shaking at high speed.
On principle, one single flask should be arranged in the middle of the
shaker plate, whereas more flasks should be distributed equally on the
plate.
At high loads (load-bearing capacity of shaker plate) and high frequency
of shaking, always make reference to load graph as aplicable for your
item (refer to "Specifications" section).
When handling hazardous fluids, make reference to applicable safety
information.

OPERATION AND CONTROLS

24

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Promax 2020Polymax 2040

Table des Matières