IEI
Before starting the item, make sure all vessels are attached safely
(must not move while shaking).
1. Set-up
Please locate the shaker on a rigid, horizontal surface. For safety reasons, keep the area
around the machine clear of other items.
Be aware of orbital movement of the shaker plate and vessel set-up protruding over the
standard table surface.
2. Electric hook-up
Use the power cord from your hardware bag and connect it with the plug connector in the
item's rear panel.
The item features two-pole circuit breakers located in the item's plug connector for ease of
access. For circuit breaker details refer to data plate.
3. Secure vessels on shaker plate
To secure vessels on shaker plate, use optional adapters.
flasks, separating funnels and a universal adapter with clamping rollers are available. For
more details refer to standard equipment and options.
In some cases using low shaking speed, vessels like Petri dishes just may be put on the anti-
skid rubber plate that comes with the item as a standard option.
Before starting shaking, make sure all vessels are secured in place properly.
3.1. Universal mount with base frame and clamping rollers.
Base frame and clamping rollers allow to safely attach whatever sort of vessels and racks on
the shaker plate.
base frame (P/N 549-50000-00)
clamping roller (P/N 549-58000-00) 2 ea. minimum
The base frame goes on the shaker plate as described below:
Remove round rubber caps located in the four corners.
Thread 4 ea. bolts (1) in the respective holes and pull tight with box-end spanner (2) from
hardware bag. Slip holding bar (3) over bolts (1) and secure with wingbolts (5).
SET-UP
20
Adapters for Erlenmeyer