Operation - Tractel tirfor TU Série Manuel D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GB
Anchor pin in position
Spring clip closed.
Spring clip open.
5.2.
blocstop™ safety devices
The blocstop™ safety device must be
anchored by attaching it to the stirrup on the
platform, or to the special device, using two
H M 12 bolts for 15.301 and 20.301, and two H
M 22 bolts for 35.30.
Bolzen
Wire ropes specially designed by TRACTEL for
hoists and for the blocstop™ safety device
must be used. These wire ropes are fitted with
hooks.
The anchoring hooks are fitted with a safety
catch. In all cases the equipment must be
anchored in such a way that the flap freely
returns to the correct closed position, pressing
on the tip of the hook.
WARNING : It is essential for safe operation
of the equipment that a check is made to ensure
that the anchoring hooks are correct- ly locked
before a load is applied.

6. OPERATION:

6.1.
tirfor
®
hoists:
The tirfor
®
is very simple to operate by moving
the telescopic handle with a to and fro move-
ment
whose
movement
according to the preference of the operator.
Any interruption in operation results in the auto-
10
can
vary

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tirfor tu 6pmTirfor tu 12pmTirfor tu 24pm

Table des Matières