Measures To Be Taken Before Putting Into Service - Burkert MP05 Instructions De Service

Bloc multiple et profil pneumatique modulaire
Masquer les pouces Voir aussi pour MP05:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Plug-in connections
NOTE
For plug-in connections, the hose lines must meet the following requirements:
• Minimum rigidity of 40 Shore D (to DIN 53505 or ISO 868);
• External diameter corresponding to DIN 73378 (max. permissible deviation
• Without burr, cut at right-angles ad with undamaged circumference;
• The hose lines must be pusched into the plug-in connectors up to the stop.
Dismantling the plug-in connections
To release the line, press in the pressure ring and pull out the hose line.

Measures to be taken before putting into service

Check all connections, voltages and the operational pressure!
Ensure that the max. operational conditions (see rating plate) will not be exceeded!
Check that ports 1 and 3 are correctly connected according to the regulations. These connections
must not be interchanged for any reason!
When operating electrically, unlock the manual override!
± 0,1 mm from nominal dimension);
I
, I
NSTALLATION
NITIALISATION AND
S
ERVICE
5470 / MP05 - 15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

5470

Table des Matières