Measures To Be Taken Before Putting Into Service; Pulse Operation - Burkert 6518 Instructions De Service

Masquer les pouces Voir aussi pour 6518:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

I
, I
NSTALLATION
NITIALISATION AND

Measures to be taken before putting into service

Check all connections, voltages and the operational pressure!
Ensure that the max. operational conditions (see rating plate) will not be exceeded!
Check that Ports 1, 3 and 5 are correctly connected according to the regulations. These connections
must not be interchanged for any reason!
When operating electrically, unlock the manual override!

Pulse operation

Function:
The pulse-controlled solenoid valves operate with two coils connected alternately.
ATTENTION!
Observe the "Pulse" data on the rating plate!
Avoid simultaneous pulse input to both coils!
NOTE
The valves can be reversed with the manual actuator.
16 - 6518 / 6519
S
ERVICE

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

6519Mp07

Table des Matières