3.3 SETTING
UP
The pillar is attached to the base using a bracket that must be attached
to the base frame first using the 4 bolts supplied. The pillar is secured to
the bracket using 2 sets of screws. The cable from the base to the
indicator module is run through the tube and taken out through the
plastic support at the top. Excess cable can be stored within the tube.
The GBC/GFC Series comes with a stainless steel platform packed
separately. Place the platform in the base.
Level the scale by adjusting the four feet. If the scale rocks re‐adjust the
feet.
Attach the indicator module to the pillar by sliding it over the bracket
with the flanges engaged in the groves on the base. Attach the cable
from the base to the connector on the rear of the indicator.
Attach the power to the indicator. Press the [On/Off] key which is at the
rear of the indicator. The software revision number will be displayed
followed by a self‐test showing all digits before the zero is displayed
along with the unit of weight that was selected last.
THE
SCALES
© Adam Equipment Company 2011