Tecno-gaz Master Flux Plus Mode D'emploi page 41

Masquer les pouces Voir aussi pour Master Flux Plus:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

 
Installation must be carried out by specialised technicians. The centralised
system must be set up in compliance with regulations in force
 
European Directive 93/42/EC
Connect the wall outlet to the equipotential point on the electrical system, with the supplied
loop connectors.
The supplied reducers must be connected to the cylinders of the centralised system.
The outlet of the N
O reducer includes a flexible tube that is connected on one end to a male
2
fitting with 1/4" G threading for connection to the system.
The outlet of the O
reducer includes a flexible tube that is connected on one end to a male
2
fitting with 1/8" G threading for connection to the system.
The fastening plate is not supplied.
NOTES ON THE CENTRALISED SYSTEM
ENGLISH
13

Publicité

Table des Matières
loading

Table des Matières