Télécharger Imprimer la page

Metabo HPT NV 1845DA Manuel D'instructions Et De Sécurité page 15

Publicité

HOW TO OPERATE THE OPERATION
PANEL
Operation panel
Power indicator
Information indicator
Power switch
1. Power switch ON
Under the condition of "Power switch OFF", push and
hold on Power switch more than 1 second, then
power indicator lights in Green.
NOTE
Do not press the push lever and/or pull the trigger
during the process of turning the power switch ON.
Doing so will prevent the power switch from turning
ON.
OFF
Light in green
ON
2. Power switch OFF
Under the condition of "Power switch ON", push and
hold on Power switch more than 1 second, then
power indicator goes off.
Under the condition of "Power switch ON", functions
below are active.
3. Select Nailing operation mode
(Full sequential actuation / Contact actuation)
After power switch turn ON, always set in Full
sequential actuation mode as initial. (Nailing
operation indicator light in blue.)
NV1845DA_C99751761_409_NA
Stylesheet: NA Version: 2024.7.4
Nailing operation
indicator
Nailing operation
switch
To change nailing operation mode, push Nailing
operation switch once. Every pushing, mode will
change between "Full sequential" and "Contact".
Lighting (Blue):
FULL SEQUENTIAL ACTUATION MECHANISM,
Blinking (Blue):
CONTACT ACTUATION MECHANISM
4. Other functions
In case of operation error, Information indicator shows
as below.
Information indicator
Status of indicator
Information indicator blinks
in red.
The power automatically
turns off after 60 seconds.
Information indicator blinks
in red.
The power automatically
turns off after 10 seconds.
Information indicator blinks
in orange.
The power automatically
turns off within
10 seconds.
TRIGGER LOCK MECHANISM
WARNING
Make sure the trigger is locked when not firing
nails.
English
Light in blue
Battery low
The battery remaining
power is empty
Recharge the battery as
soon as possible
Machine is in too cold
(below 23°F (-5°C)) or too
hot condition.
Allow the nailer to cool or
warm-up thoroughly in
adequate condition.
Contact metabo HPT for
inspection.
15
2024/07/31 17:15:40

Publicité

loading