Télécharger Imprimer la page

Westinghouse WGen14500 Manuel De L'utilisateur page 19

Publicité

TRANSPORTING
Weight hazard. Always have assistance when lifting the
generator.
• Allow the generator to cool a minimum of 30 minutes
before transporting.
• Replace all protective covers on the generator control
panel.
• Keep the unit level during transport to minimize the
possibility of fuel leakage or, if possible, drain the fuel
or run the engine until the fuel tank is empty before
transport.
• The generator wheels are only intended for hand
transport. The wheels are not suitable for towing the
generator on or off-road.
• Use the extendable handle for hand transport. Only use
the handle while the generator is OFF, stationary, and
resting on a horizontal surface. Do not use the handle
to lift the generator entirely off the ground, tow it, or
up-end it.
Fire hazard. Do not up-end the generator or place it on
its side. Fuel or oil can leak and damage to the generator
may occur.
OPERATION
LIFTING HOOK
1
Only use the lifting hook to lift the unit or
attach any load restraints such as ropes or tie-down
straps. Do not attempt to lift or secure the generator by
holding onto any of its other components.
Before lifting the generator, inspect the bracket and e
sure it is securely fastened to the generator. Do not lift the
generator unless the lifting bracket is securely fastened.
1. Hook a chain or strap through the eye on the lifting hook
and e sure it is securely fastened.
2. Connect a suitable lifting device to the chain or strap.
Inspect the chain and hook for any damaged links or
any defects that could cause failure. It is
recommended to use hooks with safety latches
installed.
3. Lift the generator slightly to ensure it is lifting straight
and level.
| 19

Publicité

loading