9. Installation
(Specialist installer)
9.1 Procedure
 Place the ventilation unit on the floor at the
installation site.
 Connect the condensation run-off and fill
the siphon up with water, see Chapter 9.4.
 Connect the ventilation channels and install
protective grilles at the external
connections.
 Install the room air control, in the living
room for example, and connect this to the
ventilation unit. Install external components
as required (CO
2
operating display). See Chapter 9.6.5 for
installation information.
 Connect up the mains power and
commission the ventilation unit. Adjust the
volumetric flow for the 3 ventilation levels
through the 6 potentiometer adjusters on
the control circuit board, see Chapter 10.3.
 Set up the planned air volumes at all
supply air and exhaust air valves, using a
suitable measuring instrument to take the
measurements.
70
sensor, external
9.2 Installing the ventilation unit
i
Important notes
● Installation work may only be carried out by
authorised specialists.
● Take the planning documents prepared by
the engineering office and the regulations
valid where you are into account.
● Take the Technical data listed in Chapter
12 into account.
● On-site work (run-off, floor construction,
etc) must all have been completed before
installation, as the ventilation unit cannot
be moved again once the ducting is
connected.
● Make a service opening in your duct
system.
● Make sure you use appropriate insulation,
sound-absorbing and installation material
such as suitable tubular sound absorbers,
supply air and exhaust air valves, overflow
openings, etc.
● Insulate the outside and outgoing air ducts
to prevent vapour diffusion for energy-
usage reasons and to prevent a build up of
condensation.
● If installation is fitted outside the thermally
insulated building envelope, supply and
exhaust air ducts must also be insulated in
the cold area.
● Additional insulation material should be
used to insulate fixing cuffs. This prevents
the build up of condensation.
● Insulate the outside and outgoing air wall
feedthroughs, in order to exclude the
possibility of a build-up of condensation.
● Make sure that there can be no build-up of
surface condensation with roof outlets.
Insulate the ventilation ducts with roof
outlets.