In addition, the following Accessories/tools are supplied:
Accessorie/tool
Chute clearing tool
Extra break bolts for spare
Spark plug key
Allen key
Ignition key, spare
3.2
UNPACKING
1. Remove all loose items from the carton.
2. Cut the four corners of the carton and let the sides fall
down.
3. Roll the snow thrower from the carton.
3.3
HANDLE
The procedure requires two persons as the handle must be
held in position during the assembly.
1. Position the snow thrower on its auger.
2. AS 56:
Assemble the gear panel. See fig. 3a.
AS 62:
Loosen both wheels from their axis and move them out
about 10 cm from the snow thrower.
3. See fig. 3b. Held the handle stright above the snow
thrower and hook on the wires into their respective
handle. Note the wire locations through the recess (Z) and
into the recess (Y). Fig. 2 shows the wire locations when
the assembly is finished.
4. See fig. 4. Assemble the upper screw (A) with square
washer (B) through the handle and screw into the snow
thrower at both sides without fastening.
5. See fig. 5. Fold carefylly up the handle forwards and
assemble the two lower screws (A) with washers (C) at
both sides.
6. Check that the wires are located according to (Z) and (Y)
in fig. 2.
7. Tighten the four screws (A).
8. Push the wheels into place and fix them to the axis.
9. Position the snow thrower on its wheels.
10. Assemble the front panel in the four holes in the handle
and fasten it with four screws with washers from below.
See fig. 6.
3.4
SNOW DISCHARGE CHUTE, SEE FIG. 7
1. Place the discharge chute (D) on the flange.
2. Mount the three carriage pieces (E) with two screws each.
3. Tighten properly.
3.5
ADJUSTMENT LEVER, SEE FIG. 8
1. Insert the adjustment lever through the eyebolt (F) from
the front.
2. Insert the end of the shaft in the plastic bushing and adjust
the worm gear to the cut out in the snow discharge chute.
3. Install the washer (Z) and lock with the locking pin (G).
4. Install the washer (Z), lever handle (Y) with screw (R)
and washer (Q).
5. Check the snow discharge chute by turning it between its
end positions. The now discharge chute shall rotate
freely.
All manuals and user guides at all-guides.com
ENGLISH
Item Fig. Number
G
1
1
W
1
2
-
-
1
-
-
1
1
Original instructions for use
3.6
GEAR LEVER, SEE FIG. 9
Assemble the gear lever to the gearbox shaft as follows:
1. Set up the machine on the auger housing and set the gear
lever (H) in the first gear forwards. See fig. 9.
2. Assemble the screw (I) through the angle joint and shaft.
Tighten the screw.
3. Tighten the screws (U) between the gear lever and the
angle joint.
4. Tighten the screw (V) until the gear lever remains in the
gear positions in the panel plate. Secure by tightening the
locking nut (W)
5. Set down the machine on its wheels.
3.7
CHECKING THE CONTROL WIRES
The control wires might need adjusting before using the
snow thrower for the first time.
See "7.4" below.
3.8
TYRE PRESSURE
Check the air pressure in the tyres. See "6.5".
4 CONTROLS
The motor is equipped with a protection grid. The
motor may never be started without the grid fitted
or with a defect grid.
See fig. 1.
4.1
THROTTLE (K)
Controls the engine's revs. The throttle has two positions:
1. Full throttle
2. Idling.
4.2
CHOKE (L)
Used when starting a cold engine. The choke has two
positions:
To the left - the choke is closed (for cold starting)
To the right- the choke is open
4.3
PRIMER (J)
Pressing the rubber prime-starter squirts fuel into
the carburettor intake pipe to make it easier to start
a cold engine.
4.4
FUEL COCK(M)
The fuel cock opens the fuel supply to the carburettor.
The fuel cock shall always be closed when the
machine is not in use.
To the left - open.
Up - closed.
4.5
START BUTTON – ELECTRICAL START (R)
(AS 62)
Activates the electric starting motor.
4.6
STOP SWITCH (S)
Used to stop the engine. The switch has two positions:
EN
47