Télécharger Imprimer la page

FAS VICTORIA Manuel D'utilisation page 25

Publicité

Les langues disponibles
  • FR

Les langues disponibles

FAS VICTORIA - ISSUE 00
When the door is open, the protected terminal block of the power cable and the wires
which connect it to the door safety switch are live. Total isolation from the electric power
supply is only obtained when the plug is removed from the external circuit breaker switch.
Therefore all the operations which require the vending machine to be powered with the
door open must be carried out only by qualified personnel informed of the specific risks
which this condition entails.
When the key is inserted in the switch on the door and the vending machine switches on, the machine executes
a coffee unit movement cycle.
FAS International S.r.l. - 60 Via Lago di Vico - 36015 SCHIO (VI) Italy - tel. +39 0445 502011 – fax +39 0445 502010 - e-mail:
8
STARTING
When the special key is inserted in the safety
switch, the vending machine fills the air-break
and consequently the boiler with water. It
takes approx. 2 minutes for the water to reach
the operating level. To ensure that the boiler is
full of water, execute a number of washing
cycles of the instants and check that the water
discharge from the dispensing spouts is
normal. At the end of this operation, switch off
the vending machine by removing the special
key from the door switch, attach the power
supply connector for the boiler heater
mounted on the board of the electrical panel
(connector H). Switch the machine on again
and wait for the water to reach the minimum
operating temperature (approx. 10 minutes).
If the temperature of the water in the boiler
drops
temperature, the vending machine goes
temporarily out of order.
FILLING
UP
THE
CIRCUIT
below
the
minimum
23
E
N
G
L
I
S
H
HYDRAULIC
operating
info@fas.it

Publicité

loading