6. INSTALLING THE CART TO THE BARREL
Parts Required:
1
x
Main Barrel
16 x
Screw
16 x
Locking Washer
16 x
Washer
Installation:
•
Lay the main barrel on its side, hopper end pointed upward, on
the cardboard. Ensure the support legs with the locking caster
wheels are pointed upward, on the same side as the hopper.
Note illustration 3A.
•
Insert the assembled cart into the main barrel brace, and secure
each leg to the brace using four washers, locking washers and
screws. Repeat same installation for the other three support
legs. Note illustration 3B.To ease installation of the final side,
carefully tum the grill to lie on its back to secure the last four
screws to the main barrel brace.
•
Once the cart is secured to the main barrel, position the grill
back onto its side (hopper end pointed upward), then carefully
lift the grill up to an upright position with the wheels on the
bottom.
NOTE If two persons are assembling the unit, the main barrel may
be lifted onto the upright cart to secure. Lift carefully to avoid
injury.
7. INSTALLING THE SEARING SET TO THE BARREL
Parts Required:
1
x
Main Barrel
1 x
Searing set
Installation:
•
Insert the tie rod into the barrel from the right side of the
furnace body.
•
Then fit the first trapezoidal part, then a ring part, then a
trapezoidal part.
•
Finally fix it with a nut as shown in the figure.
7