Télécharger Imprimer la page

Napoleon Tall Linear Vector Serie Manuel D'installation page 8

Publicité

Les langues disponibles

Les langues disponibles

general information
EN
1.3
installation overview
12
Recommended installation steps:
1. Determine venting requirements before deciding the final location of the appliance.
2. Plan out appliance enclosure, framing, fronts, accessories, etc.
3. Install rough framing (refer to "rough framing" section).
4. Place the appliance in its final position.
5. Install nailing tabs (refer to "nailing tab installation" section).
6. Install appliance venting (refer to "venting installation" section).
7. Install vent shield (refer to "vent shield installation" section).
8. Install all electrical wirings (refer to "electrical information" section).
9. Install gas lines (refer to "gas installation" section).
10. Test appliance.
11. Complete framing (refer to "finish framing" section).
12. Finishing (refer to "finishing" section).
13. Complete installation checklist in the owner's manual and apply serial number to owner's manual.
note:
For Dynamic Heat Control™/Ducted Heat Management™ installation steps, refer to the leaflet provided with
the Dynamic Heat Control™/Ducted Heat Management™ kit. Start Dynamic Heat Control™/Ducted Heat
Management™ installation before step 3 (place the appliance in its final position)
8
W415-4127 / B-0 / 03.25.24
11
5
8
9
3
4
7
6

Publicité

loading