Installation and Operating Instructions
EN
ATTENTION
NOTE
Central ventilation units AIR1 XVP
The condensate cap must be removed before commissioning!
Ball siphon available as an accessory�
1. The condensation outlet pipe is shown below (see Fig.6).
2. Attach the pipe bracket (see Fig.7).
3. Fix the pipe bend below the condensation tray. Ensure that the construction is water-tight by turning the pipe con-
nector (see Fig.8).
8
Fig�6
Fig�7
Fig�8