Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4. MOUNTING

Startline S 521 - S 524
- Remove the side cover (fig.5A).
- Insert the air hose G (fig. 5B) into hole A behind
the pole tilting cylinder.
- Insert hose G1 (Fig. 5C) into the rear connection
(Startline S 524)
- Apply pin B into hole C and fasten (tightening
torque 70Nm) with screws and washers D (Fig. 5A).
- Insert pin E into hole F and into the U-bolt of
the pole tilting cylinder, and fasten with Circlip
M (Fig. 5A).
- Connect pipe G (Fig. 5D) to the intermediate
union connected to the pole lifting tap H
(Startline S 521).
- Adjust the position from both sides of the
column. The clearance between the screw head
and the side of the column must be 0.03 mm
(fig.5E) and tighten the screws
- Undo the screw of the spring stop knob and
insert the spring contained in the packaging.
Fasten the knob using the previously unscrewed
screw. (fig.5F).
- Fit the hose connector of tank 2 into hose Q,
fasten the tank 2 to the machine with nuts and
washers R, and tighten the clamp O onto the
hose Q (fig. 5G) (T.I. version only).
G
H
Startline S 424-S 421-S 521-S 524 Operator manual
5D
No.
E
F
G
A
5E
5A
M
C
D
B
5B
5C
UK
5F
105

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Startline s 521Startline s 421Startline s 424

Table des Matières