Télécharger Imprimer la page

Grundfos SE1 50 Notice D'installation Et De Fonctionnement page 17

Publicité

Les langues disponibles

Les langues disponibles

Dry, horizontal installation with brackets
Proceed as follows:
1. Fit the base stand or brackets to the pump.
See the dimensional sketches at the end of
this manual.
2. Mark and drill fixing holes in the concrete floor
or foundation.
3. Fasten the pump with expansion bolts.
4. Check that the pump stands vertically or
horizontally. Use a spirit level.
5. Connect the power cable.
Fit an isolating valve on the inlet
side of the pump and a non-return
valve as well as an isolating valve
on the outlet side.
6. Install the inlet and outlet lines as well as the
valves, if any. Make sure that the pump is not
stressed by the pipes.
5.1.4 Torques for inlet and outlet flanges
Grade 4.6 (5) galvanized steel screws and nuts
Diameter
DC Screws
(in.)
2.5
145 4 × M16
3
160 8 × M16
4
10 8 × M16
6
240 8 × M20
Grade A2.50 (AISI 304) steel screws and nuts
Diamet
DC
Screws
er (in.)
2.5
145
4 × M16
3
160
8 × M16
4
180
8 × M16
6
240
8 × M20
The gasket must be a full face,
reinforced paper gasket, such as
Klingersil C4300. If softer gasket
material is used, torques must be
reconsidered.
Torque (rounded off
± 5)
[ft.lbs (Nm)]
Slightly
Well
oiled
lubricated
50 (70)
45 (60)
50 (70)
45 (60)
50 (70)
45 (60)
100
90 (120)
(140)
Torque (rounded
off ± 5)
[ft.lbs (Nm)]
Well
Slightly
lubricat
oiled
ed
-
45 (60)
-
45(60)
-
45 (60)
-
90 (120)
17

Publicité

loading

Ce manuel est également adapté pour:

Se1 80Se1 100Sev 65Sev 80Sev 100