Télécharger Imprimer la page

baltur BT 250 DSG 4T Manuel D'installation, D'utilisation Et D'entretien page 33

Masquer les pouces Voir aussi pour BT 250 DSG 4T:

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com
TABLE OF PIPELINE FOR BT 250 DSG-4T
GRAVITY FEED SYSTEM
Pump axis
SIPHON FEED SYSTEM WITH FEED FROM THE TOP OF THE TANK
Pump axis
SUCTION FEED SYSTEM
Pump axis
H - Height difference between minimum fuel tank level and pump axis.
L - Total length of pipeline, including vertical lenght. Subtract 0,25 mt.
1 Tank
2 Feeding pipe
3 Wire-net filter
4 Pump
5 Degasifier
1 Tank
3 Wire-net filter
4 Pump
6 Suction pipe
7 Return pipe
1 Tank
3 Wire-net filter
4 Pump
6 Suction pipe
7 Return pipe
10 Bottom valve
N.B. Comply with existing regulations regarding apparatus
required in the pipeline system
for every elbow or gate valve.
9 / 20
0006081081_200907
6 Suction pipe
7 Return pipe
8 Automatic fuel interception
device at burner shut off
9 Non-return valve
H
Total length meters
meters
Ø = 16mm Øi. 18 mm
1
30
1,5
35
2
35
2,5
40
3
40
8 Automatic fuel interception device
at burner shut off
9 One-way valve
10 Bottom valve
H
Total length meters
meters
Ø = 16mm Øi. 18 mm
1
30
1,5
35
2
35
2,5
40
3
40
Dimension P = 3,5 m. (max.)
H
Total length meters
meters Ø = 16 mm Øi. 18 mm
0,5
21
1
18
1,5
15
2
11,5
2,5
8,5
3
5,5
3,5
-
E
N
G
L
I
S
H
40
45
45
50
50
40
45
45
50
50
34
29
24
19
14
9
3,5

Publicité

loading

Ce manuel est également adapté pour:

Bt 300 dsg 4t