Angelo Po 191BR1GA Manuel D'utilisation Et D'installation page 67

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

REPLACEMENT OF THE PILOT LIGHT INJECTOR
To carry out this operation,
proceed as follows.
1 - Turn off the gas supply
tap.
2 - Undo the screws (C)
and remove the control
panel (D).
3 - Unscrew the union (E).
4 - Remove the nozzle (F)
and replace it with the
one suitable for the
type of gas in use (see
table at back of manu-
al).
5 - Retighten the union (E).
6 - Replace the control panel (D) on completion of
the operation.
REPLACING THE WELL TILTING DEVICE
To carry out this operation, proceed as follows.
1 - Turn off the gas supply tap.
2 - Undo the screws (A) and remove the control
panel (B).
C
- 31 -
D
C
A
F
E
IDM-39616201800.tif
B
A
IDM-39616201200.tif
English
IT
GB
DE
FR
ES

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

191br2ga191br3ga291br1ga291br2ga291br3ga

Table des Matières