Télécharger Imprimer la page

Sentiotec Pro-B2 Instructions De Montage Et Mode D'emploi page 19

Masquer les pouces Voir aussi pour Pro-B2:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 66
Installation instructions, only for experts
Observe the following points when connecting the power to the sauna control unit:
● Installation may only be performed by a qualified electrician or similarly quali-
fied person.
Please observe that in the event of a guarantee claim, a copy of the bill
from the electrician performing the work must be presented.
● Work on the sauna control unit may only be performed when the power has
been disconnected.
● There must be a fixed connection for the electrical power supply.
● An all-pole disconnecting device with full cut-off compliant with overvoltage
category III must be fitted on-site.
● Observe the connection diagram (Fig. 4) on page 20.
5.1. Connecting the power supply cable and heater cable
1. Guide the power supply and heater cable through the cable bushings
and
into the connection area for 230 V/400 V
8
2. Connect the power supply cables to the terminal strip
with the connection diagram. Observe the operating instructions for the
respective devices.
5.2. Connecting the light
1. Guide the light cable through the cable bushing
for 230 V/400 V
2. Connect the light cable to the terminal strip
nection diagram. Observe the operating instructions for the respective device.
.
f
.
f
in accordance
c
into the connection area
b
in accordance with the con-
d
p. 15/30
9
EN

Publicité

loading

Ce manuel est également adapté pour:

Pro-b31-015-4551-015-457