Preliminary operations
nElectrical pre-equipment
To motorise your gate:
• Fit a 230 V electrical input to one of the pillars and as close as possible to the SGS motor.
• Connect the pillars using a 2 x 1 mm
cable, provided.
2
Ensure that you have an Orange ICT Ø 25 mm protective sheath for underground cabling.
If a cable conduit cannot be made, use a cable grommet which will withstand the passage of
vehicles (ref. 2400484).
• Ensure that there is a sheathed connection between the two pillars for the cell wiring.
Electronic
Boîtier
unit
électronique
2 3
Reinforcement
1
Renfort
Flexible ICT sheath
Gaine Souple ICT
1
1
1
Power supply input: (3 x 1.5 mm
)
2
2
24 V connection between the two motors
2
2
supplied: (2 x 1 mm
)
2
3
3
4
4
Power supply
l
In order to operate, the gate opening device must be supplied by 230 V - 50 Hz.
The electric line should be:
• Exclusively reserved for the gate opening device.
• Fitted with protection :
– a 10 A fuse or breaker,
– a differential type device (30 mA).
• Installed according to current electrical safety standards in the countries in which it is used.
An all-pole supply cut-off device must be provided:
• either by using a supply cable fitted with a plug,
• or by using a switch ensuring a minimum separation distance between the contacts of 3 mm on
each pole (see EN 60335-1 standard).
It is recommended that you fit a lightning conductor (max. residual voltage 2 kV).
Boîtier
Connection
de
box (not
raccordement
supplied)
(non fourni)
2 3
(
)
câble 2 x 1 mm
2
entre les moteurs
2 x 1 mm² cable between the motors
câble 2 x 0,75 mm
2
entre les cellules
2 x 0.75 mm² cable between the cells
1
2
3
24 V connection between the two cells
for automatic operation: (2 x 0.75 mm
4
Preliminary operations
Cells (optional)
l
The cells are essential for operation in automatic mode and for opening in public areas.
• Cell wiring (see page 15)
The 24 V input and the signal from the contacts (receiver cell) must be under the cells.
Drill the pillars to feed through the sheaths.
Receiver cell
Cellule réceptrice
4
1
4
Cellule réceptrice
Receiver cell
2
3
4
4
One sheath fed through pillars
)
2
n Safety instructions
The safety instructions must be followed throughout the installation:
• Take off your jewellery (bracelet, chain, etc.) during installation.
• For drilling and welding operations, wear special glasses and appropriate protection.
• Use appropriate tools, specified on page 4.
• Be careful when handling the motorisation system to prevent any risk of injury.
• Do not connect the unit to the power supply or to the backup battery (optional) before the ins-
tallation process is complete.
• Never use high pressure cleaning equipment.
Cellule émettrice
Transmitter cell
Côté Chaussée
Pavement side
vue de dessus
top view
Property side
Côté Propriété
vue de face
Front view
Transmitter cell
Cellule émettrice
Pavement side