• Press the button (2) to give the measured value a positive rating. A tick symbol appears next to the R
The test sequence continues.
• Press the button (3) to give the measured value a negative rating. An X symbol appears next to the R
"FAIL" appears on the display to confirm that the measurement has been stopped.
• If R
is lower than the permissible limit value, the measured R
PE
and a tick symbol appears next to the R
performed again with reverse polarity and the highest measured value of both
measurements is displayed.
• Once the R
test has been passed, the insulation resistance test is started.
PE
• If "LO LOAD" appears on the display, please check that the test object has been
switched on.
• If the test object is on but the load is too low (R
to continue the test sequence.
• If "HIGH LOAD" appears on the display, it indicates an excessive load (RL-N < 14 Ω, I
object.
• There is a risk of a short-circuit or earth fault. Check for a short-circuit between the external conductor (L) and the
neutral conductor (N) on the test object.
• If there is no short-circuit, you can continue with the test sequence by pressing the button (2).
• If the insulation resistance R
symbol.
Mains operation mode:
• The GT-6000 interrupts the test sequence after the R
to switch the mains voltage from 230 V to the test socket by means of a flashing "I
• Ensure that the test object is switched off. Accidental start-up can lead to injuries and damage.
• Press the button (4) to measure the protective conductor current using the differential current method.
• The protective conductor current measurement (differential current measurement) starts only once the mains volt-
age has been properly established.
• Step 1 (of 2):
• After a measurement time of 5 seconds, the mains polarity is reversed and the
protective conductor current is measured with the reverse mains voltage ("L/N" -
"N/L"). The highest measured value of both measurements is displayed.
• Step 2 (of 2):
• If the protective conductor current is lower than the permissible limit value, a tick
symbol appears next to the I
• The overall test is considered passed when "PASS" is shown on the display.
50
symbol. The R
PE
> 6 kΩ), press the button (2)
L-N
is higher than the permissible limit value, a tick symbol appears next to the R
ISO
symbol.
LEAK
value is displayed
PE
measurement is then
PE
measurement (insulation resistance) and prompts the user
ISO
PE
PE
> 16 A) from the test
LOAD
" symbol.
LEAK
symbol.
symbol.
ISO