How to construct the sauna:
Note – there are (11) power connections in all and several low voltage connections.
(7) are in the sauna: (back, left and right) panels, bench valance, bench valance
fan, bench and main power connection.
There are additional power connections on the top outer face of the ceiling.
(1) Mains connection cable for the sauna. Do NOT insert the main electrical connection cable
for the sauna into the socket before all the assembly steps have been completed correctly.
------------------------------------------------------------------------------------------------------------------------------------------------
There are (5) power connection/junction boxes that are labelled accordingly and must be connected
after assembling each section.
Back wall panel
B1 to B1
These (5) power plugs are connected easily by simply inserting the white plug of the white junction
box cover into the correct plug-in connection (3) in the junction box.
Example below: L1 to L1 (left panel power connection) (left panel junction box)
Fitting the junction box covers: After the junction box has been connected securely fix the junction
box cover with a Phillips screwdriver and 2 Phillips screws from Box 1.
Left
Right
L1 to L1
R1 to R1
Page 3
Bench valance
S3 to S3
Bench
S1 to S1