Setting In Operation - Installation; Clock With Batteries; Fitting The Batteries; Clock With External Power Supply - Bodet Cristalys Date Instructions De Mise En Service Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

III - SETTING IN OPERATION - INSTALLATION

3.1 Clock with batteries

Fitting the batteries

a. Turn the clock over onto a table.
Unscrew the anti-theft locking screw.
Push in front of the 2 arrows on the wall bracket to
unclip it.
Remove the wall bracket / battery cover on the
back of the clock.
b. Insert the 4 batteries (type LR14) matching up the [+] and [-] symbols (the clock can function
with only the upper 2 batteries).

3.2 Clock with external power supply

For external power supply Cristalys clock : connect the low voltage power supply, 6V to 24 V
AC or DC on terminals 3 and 4.
Time synchronisation
Power supply 6V to 24 V AC
or DC, minimum 10 mA without
polarity distinction
The external power pack must be SELV-
type, supplying voltage contained
between 6 and 24V AC/DC, 10 mA
minimum and in accordance with the
limited power supply criteria of the EN60950 standard § 2.5.
Do not insert batteries if an external power supply is connected.

3.3 Link-up to a time distribution network

Cristalys clocks can be synchronised by Minute or ½ minute //, or IRIG-B/AFNOR time
distribution network.
Connect the time coded line to terminals 1 and 2 on the terminal strip.
Time distribution type has to be configured in the technician menu (see page 41).
Remark : There is no polarity, but if there is several clocks, they have to be connect in the same
order.
Diag.: 3
LR 14
LR 14
LR 14
LR 14
Fixing points
27

Publicité

Table des Matières
loading

Table des Matières