I - Initial Verification; Unpacking The Clock; Backup; Safety Instructions - Precautions For Use - Bodet Opalys Date Instructions De Mise En Service Et D'utilisation

Masquer les pouces Voir aussi pour Opalys Date:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

TABLE OF CONTENTS

I - INITIAL VERIFICATION

Thank you for choosing a BODET clock. This product has been carefully designed for your
satisfaction based on ISO9001 quality requirements. We advise you to read this manual
thoroughly before attempting to manipulate the clock.
These
indicate important comments.
Keep this booklet during all the life of your clock, so that you can refer to it each time it is necessary.

1.1 Unpacking the clock

Unpack with caution and check the contents of the packaging. It must contain :
- The Opalys date clock clipped on to its wall holder,
- A 12W 240V/24V power supply,
- A fixation kit (2 screws + 2 rawlplugs),
- A cleaning kit (impregnated antistatic cloth)
- This booklet,
- with option, a table holder.
Remark : when unpacking, some segments of the clock can be activated. This is not a default,
connect the low voltage power supply and after a few seconds the problem will disappear.
Versions : A descriptive label is fixed to the back of the clock :
938224A
RAD DCF = the clock is radio-synchronised by a DCF antenna.
938233A
AFNOR / IMP = the clock is receiving (driven by a master clock delivering impulses,
minute or 1/2 minute from 12 to 48V, on a parallel line, or coded time AFNOR NFS-87500A).
938242A
RAD DHF = the clock is radio-synchronised by a DHF transmitter.
Bodet accepts no responsibility for any use not in compliance with these instructions.
Any modification to the product will invalidate the warrantee.

1.2 Backup

All the parameters for the clock are saved permanently even in the absence of power.
The clocks keep their time bases during a few days thanks to their internal battery.

1.3 Safety instructions - precautions for use :

The installation and maintenance of this equipment must be carried out by qualified personnel.
The mains power supply should be installed inside a case that will ensure protection against
electrical shocks.
The power supply is connected to the 230 V mains. The installation must observe the standard
IEC 364.
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

606085 p

Table des Matières