I - Initial Verification; Unpacking The Clock; Cleaning; Pre-Requisit - Bodet Cristalys 7 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

I - Initial Verification

Thank you for choosing a BODET clock. This product has been carefully designed for your
satisfaction based on ISO9001 quality requirements. We advise you to read this manual
thoroughly before attempting to manipulate the clock.
Keep this booklet during all the life of your clock, so that you can refer to it each time it is
necessary.
Bodet accepts no responsibility for accidents resulting from any use not conforming
with the above provisions.
Any modification to the product will invalidate the warrantee.

1.1 Unpacking the clock

Unpack with caution and check the contents of the packaging. It must contain :
■ The Cristalys clock clipped on to its wall bracket,
■ A mounting kit (2 screws + 2 rawlplugs),
■ A cleaning kit (impregnated antistatic cloth)
■ This booklet,
■ On option, a table holder.
Note : when unpacking, some segments of the clock can be activated. This is not a defect,
connect the power supply and after a few seconds the problem will disappear.

1.2 Cleaning

Use an antistatic product identical to that supplied. Never use alcohol, acetone or other solvents
which may damage your clock's casing or glass.

1.3 Pre-requisit

For the commisioning of the clocks you must install «BODET Detect». This software is available
on BODET web site www.bodet-time.com as a free download.
Note: the Ethernet network connection to which the Bodet clock is connected must be PoE, the
power being supplied by a PoE switch or a PoE injector.
Bodet recommends the following devices:
■ PoE injectors: Zyxel, Tp link, D-Link, HP, Cisco, Axis, ITE Power Supply, PhiHong, Abus,
Globtek.
■ PoE switches: D-Link, HP, Planet, Zyxel, Cisco, NetGear, PhiHong.
30

Publicité

Table des Matières
loading

Table des Matières