6. Assembly of misting equipment
Completely assemble the mistblower before its
first use.
Affix spraying-attachments to unit (installation
sequence from a to d).
Fig. 3
The blower elbow (a) is already fixed in the blower
housing with the two screws (a'). Ensure the elbow
can swivel easily. Push pleated hose (b) onto
blower elbow and secure with clamp (b').
Push handle (c) onto spray tube (d) and fix in the
required position.
Push the spray tube (d) with twist coupling into the
pleated hose (b) until locked. Secure with clamp
(d').
Place spray nozzle (Fig. 1, Pos. 15) on to spray
tube (vertical to handle) and secure.
Push formula delivery hose (2 pieces) on nipple of
the handle and to the spray nozzle. Secure the
hose alongside the pleated hose.
Assembly of misting equipment ; Adjustment of shoulder straps
Fig. 4
Fig. 2
Check hose connection to on/off tap and retighten
cap nut if required.
Shut on/off tap, fill some plain water in formula tank
and check for any leakage.
Note: The spray tube can be twisted and turned in
the pleated hose with the handle. Ensure that all
hose and cable connections are safe and without
sharp bends.
7. Adjustment of shoulder straps
Fig. 5
Place the mistblower on the back and connect to
quick couplings on either side.
The straps can be adjusted to the required length
with friction slides. Simply pull down both strap
ends to tighten straps (a).
Strap tension can be released by lifting both friction
slides (b).
Note:
The shoulder straps are correctly adjusted when
the back plate of the mist-blower rests firmly
against the back of the operator.
ENGLISH 7