4.3
Connecting the pipes
For use as a backwater chamber, continue at chapter 4.4.
Ecolift XL
(A)
Routing the pressure pipe
above the backwater level
Connect the inlet (1).
Connect the outlet (2).
Connect the pressure pipe.
Routing of the pressure pipe directly into the sewer pipe
Sewer pipe
L1 [cm]
DN100
DN125
DN150
DN200
010-701
L2 [cm]
20
35
21.5
33.5
24
28.5
32.5
22.5
Engineering chamber LW 1000 /
Installation and operating instructions
Fig. 1: Ecolift XL
27 / 100