Shortening the upper section (optional)
Mark the upper section (1) all the way round in such
a way that it projects at least 8 cm into the waterproof
extension section (2).
Use a jigsaw (15°) to cut to the required length.
Deburr the edges.
Align the upper section
KESSEL upper sections are tiltable The upper section (A)
with clear opening 600 can be tilted by 5° and the upper
section (B) with clear opening 800 can be tilted by 3° to
adapt it to the circumstances on site.
4.5

Routing electric cables

Fix cable fasteners (1) (optional) to the scoring points (2).
Use the fixing screws to fix these in place.
Make sure that the fixing screws are not longer than
16 mm.
The chamber wall could leak.
An appropriate hole saw can be used for a cable passage.
Height of interme-
diate section [cm]
250
500
Taper
Seal for pipe penetration
DN50 (Ø 50)
DN70 (Ø 75)
DN100 (Ø 110)
DN125 (Ø 125)
DN150 (Ø 160)
4.6

Connecting the ventilation pipe

When routing the ventilation pipe, make sure you leave sufficient room for later fitting and maintenance work.
All the system components (pumps, backwater flaps and pipework) must remain easily accessible.
010-701
Maximum diameter
DN100
DN150
DN200
Art. no.
850114
850116
850117
850118
850119
Engineering chamber LW 1000 /
Installation and operating instructions
31 / 100

Publicité

Table des Matières
loading

Table des Matières