Installing the connection bolts
Use pliers to press both connecting surfaces together.
Knock the connecting bolt (1) in place and release the pli-
ers again.
Insert the seal for the next chamber element as described
above etc.
Install the upper and intermediate sections.
Inserting a waterproof extension section (optional)
Insert waterproof extension section (3).
Insert the seal (2) in the waterproof extension section (3).
Fit the upper section
(A)
(B)
Fit greased seal (1) into the taper.
Insert the upper section (2).
If necessary, shorten the upper section as described
below.
30 / 100
Entry 800 m
Entry 600 m
Engineering chamber LW 1000 /
Installation and operating instructions
010-701