Ebro; Lisboa Series; Forced Ventilation - Bronpi LORCA-R Instructions D'installation, D'utilisation Et D'entretien

Masquer les pouces Voir aussi pour LORCA-R:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 28
-
After the previous steps, the flue cover must be fixed directly on the top of the chimney hood. (see drawing D2.19)
-
Finally, with the spray paint can that is supplied with the fireplace, you can touch up the paint damage caused by
the telescope itself, as well as paint the tightening nuts used to fix the telescope.
2.1.2.
This model of fireplace does not include a draft-diverter valve and incorporates am oven on the upper part with an
airtight cooking chamber. The base of the oven is made of refractory brick (it absorbs heat and irradiates it). Heating
is produced when the smoke passes through the sides and the upper part of the oven. On the ceiling of the oven
there is one pipe that connects the cooking chamber with the smoke outlet in order to remove the gas generated in
the oven.
The oven has the following components:
-
Thermometer: it is disassembled and you can find
it in the baking tray. It shows the cooking temperature
of the oven. In order to install it, it is necessary to
introduce the sheath through the hole of the door and,
then, put the nut. (see drawing D2.20)
D2.19
WARNING!! The thermometer shows the
cooking temperature of the oven. It never shows the temperature of the
combustion chamber. The maximum cooking temperature for the oven is
200-230ºC. If the thermometer shows that the oven reaches a higher temperature, this means that the equipment has been overloaded
and this fact will invalidate the warranty.
-
Tray. It is made of stainless steel. It can be adjustable in two different levels according to the level that we use. In order to avoid the
damage of the tray, it is recommended to extract it outside the oven when it is not being used.
-
Refractory bricks. They are placed on the base of the oven. Their purpose is to absorb heat and irradiate it.
2.1.3.

LISBOA SERIES

Forced ventilation

The metallic fireplaces of the Lisboa series ones are provided (as standard) with a tangential turbine of 290m
distribution of the heat through the ventilation of the environment of the installation site.
The start-up process and the control of the ventilation are made through the three positions switch located in the
bottom right side (see drawing D2.221.
These three positions have the following functions:
-
Position 0: The turbine will remain off even if there is combustion inside the fireplace, so you have to
position the switch in the position 1 or 2 if you want the turbine to operate.
-
Position 1: the turbine runs continuously at slow speed.
-
Position 2: the turbine runs continuously at fast speed.
Turbine connection
On the right rear side of the fireplace you will find the conductor that connects to the network.
It is advisable not to cut it in its length completely since this section is useful when replacing electrical components of the interior. It is
fundamental the right connection to the grounding system.
Installation of the appliance must be carried out by qualified personnel in accordance with
current regulations.
Connecting air pipes for the channeling
These metallic fireplaces are designed for the connection of two additional ventilation outlets (see drawing
D2.22). In order to do this, it is necessary to perform the following steps:
a.
Remove the closing covers from the air exits located at the top of the combustion chamber.
b.
Fix the connecting collars in the gap or resulting holes.
c.
Drill the wall so flexible pipes (fireproof) 12cm diameter can pass through and install their corresponding
connections.
d.
Fix the pipes with metal clips to the corresponding collars and grates. Each pipe can't exceed
recommended channelling length and must be insulated with insulating materials to avoid noise and heat
dispersion.
e.
The grates must be placed at a height of not less than 2 meters above the floor in order to avoid that the
hot air, on its way out, disturbs people.
INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS

EBRO

19
D2.20
/ h in order to improve the
3
D2.21
D2.22
METALLIC FIREPLACES

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

HuelvaHuelva-cEbroLisboaLisboa-3cHuesca

Table des Matières