Cabling Bracket for Control & Main Cable
When bottom cover is removed you can install the cabling brackets, if required.
The cabling brackets are standard with C2 filtering products and can be obtained from Parker using the following
part numbers:
AC30V Frame E Illustrated
Power Wiring Connections
Feed the power supply and motor cables into the drive under
the cable clamps using the correct cable entries, and connect
to the power terminals. Tighten all terminals to the correct
tightening torque, refer to the 'Terminal Tightening Torques'
table in the AC30 Product Manual, Chapter 4 'Installation'.
Refer to product manual for Frame K.
Note: Cable clamps and earthing brackets are only
supplied with a C2 EMC Filter kit (see previous page for
part numbers), see page 1-11 for motor termination
details.
This manual was downloaded on www.sdsdrives.com
+44 (0)117 938 1800 - info@sdsdrives.com
The part numbers for the cabling bracket kits are:
Wall/Panel Mount
Frame D – LA501935U001
Frame E – LA501935U002
Frame F – LA501935U003
Frame G – LA501935U004
Frame H – LA501935U005
Frame J - LA501935U006
Frame K – not applicable
AC30D control and system terminal cable
brackets kit is LA501935U007
1-7
English
Through Panel Mount
LA503117U001
LA503117U002
LA503117U003
LA503117U004
LA503117U005
not applicable
not applicable
Control cable
wiring bracket
Main cable wiring
bracket