ESH Basic-FUBO-GK/MBK - Single-line building package
for buildings without a basement

12 Preparing for assembly

For the precise positioning of the ESH Basic-FUBO-GK a batter
1
board must be prepared on site. The line ideally identifies
both the upper edge of the unfinished floor, as well as the
wall inner side (see Fig.: 1).

13 Assembly of ESH Basic-FUBO-GK

Insert ESH Basic-FUBO-GK component into the setup device
1
and fasten with wing screws (see Fig.: 2).
Then align and position ESH Basic-FUBO-GK to the batter
2
board lengthwise with the setup device. For this, align
the basic body level with the spirit level and insert into
the ground.
The precise height is not yet important (see Fig.: 3).
Align ESH Basic-FUBO-GK to the wall (see Fig.: 4).
3
Legend forFig.: 4
1
at least 5 cm
Wall inner side gap (prefabricated wall) to the basic
body outer surface: at least 5 cm.
The basic body must not be covered by the inner
walls later (shell wall + plaster).
The position of the ESH Basic-FUBO-GK must
be agreed upon with the energy suppliers!
Art. Nr.: 5090033074
Rev.: 01/2018-09-05
EN
Fig.: 1
Fig.: 2
Fig.: 3
Fig.: 4
1
29

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Esh basic fuboBasic-fubo-bhpEsh basic fubo-bhp-xm

Table des Matières