ESH Basic-FUBO-GK/MBK - Single-line building package
for buildings without a basement
Please note that the finished floor level is within
the shortening area (important for structures >
200 mm and < 80 mm) (see Fig.: 20).
Legend for Fig.: 20
1
Unfinished floor
2
Finished floor
3
Overhang max. 50 mm
4
Insulation
5
Shortening area
After the height fixation of the ESH Basic-FUBO-GK and
14
during the filling with sand it can be aligned based on
position using a spirit level.
If necessary, check the wall clearance again. Wall inner
side gap to the wall sleeve outer surface: at least 5 cm
(see Fig.: 4 and 21).
Fixed position and stable ESH Basic-FUBO-GK mounted
vertically, aligned to the batter board and filled with
sand (see Fig.: 22).
NOTE!
No sealing due to incorrect installation!
Incorrect preparation can result in damage!
• The upper edge of the finished floor always has
to be above the red marking.
In buildings without a floor structure the lower
edge corresponds to the red marking of the upper
edge of the unfinished floor. A shortening of the
basic body is created by cutting the wall sleeve to
length on a finished floor level and is possible up to
the red marking as a maximum. Later reworking is
not applicable if the upper edge of the basic body
is aligned with the upper edge of the finished floor
Art. Nr.: 5090033074
Rev.: 01/2018-09-05
1
5
Fig.: 20
EN
2
3
4
Fig.: 21
Fig.: 22
33