ESH Basic-FUBO-GK/MBK - Single-line building package
for buildings without a basement
Then align the ESH Basic-FUBO-GK above the "unfin-
12
ished floor upper edge" marking (sticker on the ESH
Basic-FUBO-GK) on the same level as the batter board
(unfinished floor level).
After the height adjustment, fix the wing screw and
therefore fasten the construction (see Fig.: 15).
•
On the ESH Basic-FUBO-GK there is an "un-
finished floor upper edge" label/mark (see
Fig.: 16).
•
After connection of the pipes maintenance
of the bend radii R ≥ 1 m is to be checked.
•
The setup device included is only a temporary
fastening. Only the immediate filling with
sand up to the level of the granular subbase
gives a fixed positioning of the base plate
implementation.
Legende zu Abb.: 16
1
label/mark"unfinished floor upper edge"
NOTE!
No sealing due to incorrect installation!
Incorrect preparation can result in damage!
•
The adjustable 3-ribbed seal must always be
located in the concrete plate.
•
The water barrier flange from the ground
spike may not be at the same height as the
3-ribbed seal of the casing pipe for reason of
space (see Fig.: 17 and Fig.: 18).
When correctly positioned, the basic body stands 200 mm
13
above the unfinished floor.
A shortening of the basic body to the later floor construc-
tion or the finished floor level is (later system-dependently)
possible by up to 130 mm (see Fig.: 19).
Legend for Fig.: 19
1
red marking (shortening area)
32