Hauff-Technik ESH Basic-FUBO-GK/MBK Instructions D'installation page 30

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ESH Basic-FUBO-GK/MBK - Single-line building package
for buildings without a basement
Then release wing screws, hold onto ground spike and
4
remove ESH Basic-FUBO-GK.
Insert the included impact screw into the ground spike
and fasten with the wing screw (see Fig.: 5).
Strike the ground spike into the ground approx� 300 mm
5
or until sufficiently fastened (see Fig.: 6).
Remove impact screw again.
Move the previous position of the 3-ribbed seal to the
6
adapter tube to 145 mm (see Fig.: 7).
Legend for Fig.: 7
1
145 mm
Place ESH Basic-FUBO-GK upside down on the ground
7
(see Fig.: 8).
Grease the opening of the transition sleeve as well as the
8
front area of the adapter pipe from the KES pipe system
with lubricant (see Fig.: 9).
30
Art. Nr.: 5090033074
Rev.: 01/2018-09-05
1
EN
Fig.: 5
Fig.: 6
Fig.: 7
Fig.: 8
Fig.: 9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Esh basic fuboBasic-fubo-bhpEsh basic fubo-bhp-xm

Table des Matières