Télécharger Imprimer la page

Speck pumpen BADU JET Smart Traduction Du Instruction D'utilisation Originale page 82

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 108
Installation
5.2.8
Electrical control unit
The control for the counter swim unit is to be located in a dry
room. Connection of the supply lines and pump is to be carried
out in accordance with the enclosed wiring diagram. The
applicable regulations (VDE) are to be observed. Maximum
distance between pool and control box 10 m!
NOTICE
The control box may only be mounted to the existing holes.
5.3
Final assembly (Qualified specialist)
WARNING
Injury due to suction if the suction panel is not mounted!
It is imperative that the suction panel is mounted.
All guarantee rights and claims for compensation are rendered
invalid for damage resulting from the suction panel not being
mounted or being mounting incorrectly.
NOTICE
Only tighten the screws hand-tight. Do not use any force!
After the installation of the main housing (pre-assembly kit):
1.
Glue in the cable protection hose and the hose for air supply.
See "Fig. 15" on page 29
2.
Position the nozzle housing (102.1) on the main housing (1).
3.
Lead the pneumatic hose through the protective conduit and
seal it with the cable gland (20).
4.
Attach the air pipe to the air regulator (21), assembled on
site, with a clamp (8).
5.
Attach the nozzle housing (102.1) to the main housing (1)
with 4 tapping screws (61).
6.
Connect the jet pump (92) to the main housing (1) on the
suction and pressure sides using the half screw (98, 99,
100), the rubber bracket (79) and the corresponding clamps
(75).
7.
Connect the pump motor as shown in the wiring diagram.
Pay attention to the correct direction of rotation for
three-phase motors! Only carry out the direction of
28 EN
06|2020

Publicité

loading