Télécharger Imprimer la page

hajdu HP-TOWER HPT300 Manuel De Mise En Service, D'opération Et D'entretien page 89

Chauffe-eau thermodynamique

Publicité

Les langues disponibles

Les langues disponibles

Installing a filter for the air input of the appliance. If the appliance is connected to an
air duct, a filter must be installed at the inlet of the air duct.
Figure 9.1.-8.
In order to ensure the continuous drainage of condensate water, please, install
the appliance on a horizontal surface. If this is not feasible, please, ensure that the
drainage pipe branch is put in the lowest possible place. It is recommended to place
the appliance in such way that the angle of inclination between the appliance and the
vertical plane should not exceed 2°.
Before the first start-up of the appliance, please, check the following elements:
Proper installation of the appliance;
Proper connection of all pipes and wires;
The cooling pipe has been tested for leaking;
Efficient water discharge pipe;
Full insulation protection;
Adequate earthing;
Appropriate power source;
The air inlet and air outlet are not restricted;
There is no air in the water pipeline and all the valves are in open position;
Efficient earth leakage protection is in place;
There is sufficient water inlet pressure (≥0.15MPa)
After being connected to the water pipeline system and the mains supply system, the
hot water tank must be filled up with water from the household water supply system.
Before activating the heating, the tank must be filled with water. While filling the tank
with water, open the hot water valve of the closest tap, but keep all other valves closed.
Then open the closing valve installed in the cold water pipeline (item 1, Figure 2.5.-1).
The tank will be filled up when water appears in the tap. For flushing purposes, let the
water flow for a few minutes, then close the hot water valve.
Condensate water discharge
Figure 9.1.-9.
8.2. First start-up
89

Publicité

loading

Ce manuel est également adapté pour:

Hp-tower hpt300c