3.6
Displays, operating keys and their functions
Control unit
(1)
Ready for operation LED (green)
(2)
Alarm LED (red)
(3)
LED system tank switch-on level reached (orange)
(4)
LED wastewater pump running (orange)
(5)
LED wastewater pump run-
ning (orange, only Duo Tronic)
(6)
Operation symbol
(7)
Switch off (acknowledge) alarm button
(8)
System tank symbol
(9)
Wastewater pump on (manual) button
(10)
Wastewater pump on but-
ton (manual), (only Duo Tronic)
016-102_01 DE_EN_FR
Pumping station / Installation and operating manual
61 / 144