Power Down Operation - Leggett & Platt performance Queen Manuel Du Propriétaire

Base réglable
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

To lower the base to the flat position during an electrical power outage, complete the following procedure:
STEP 1
Verify power is unplugged from electrical power source.
STEP 2
Locate (1) power brick (FIGURE 12) and (2) 9 volt batteries (not
included).
FIGURE 12
POWER
BRICK
STEP 3
Install (2) 9 volt batteries in power brick (FIGURE 13).
FIGURE 13
UNDERSIDE OF
POWER BRICK

POWER DOWN OPERATION

INSTALL (2) 9 VOLT BATTERIES
*BATTERIES NOT INCLUDED
Performance Models Signature Owners Manual 99301468-b
BATTERY
COMPARTMENT DOOR
(push down and slide off
to remove)
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Performance split cal-king

Table des Matières