Power Down Operation - Leggett & Platt STYLE FOUNDATION DESIGN S-122 Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Use this procedure to lower the base to flat during a power outage. Do NOT put batteries in power down device
until necessary for use.
Note: Power down device uses 9-volt alkaline batteries, which are not included.
STEP 1
Insert (2) 9-volt alkaline batteries into the power brick (FIGURE 10).
FIGURE 10
POWER
BRICK
STEP 2
Press the FLAT BUTTON on the remote control or in-line switch (if equipped)
(FIGURE 11) to adjust the base to the level position.
FIGURE 11
STEP 3
Remove batteries from power brick and discard.
Note: Batteries are good for only one use.
When power is restored from outage, base is ready to resume normal operation.

POWER DOWN OPERATION

BATTERY COMPARTMENT DOOR
(push in and slide up to remove)
INSTALL (2) 9 VOLT
BATTERIES
*BATTERIES NOT
INCLUDED
FLAT
BUTTON
IN-LINE
SWITCH
13

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Brio b-120

Table des Matières