To lower base to the flat position during an electrical power outage,
complete the following procedure:
NOTE
FOR EMERGENCY USE ONLY. BATTERIES
ARE NOT TO BE USED FOR NORMAL
OPERATION OF BASE (9-vOLT ALkALINE
BATTERIES NOT INCLUDED)
SteP 1
Verify power supply is unplugged from electrical power source.
SteP 2
Locate (1) power down device and two (2) 9-volt alkaline batteries (not included)
(FIGURE 6).
FIGURE 6
(1) POWER
DOWN
DEvICE
SteP 3
Install (2) 9-volt alkaline batteries in power down device (FIGURE 7).
FIGURE 7
ALkALINE
BATTERIES
INSTALL ONLY
ONE WAY IN
POWER DOWN
DEvICE

PoWer doWN oPeratioN

(2) 9-vOLT
ALkALINE
BATTERIES
(NOT
INCLUDED)
S-cape
2.0 / S-cape
+ 2.0 / Simplicity™ 3.0 Owners Manual 290-0010-c
®
®
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

S-cape 54 + 2.0Simplicity 3.0G-122 nwhG-122G-122 usb

Table des Matières