Installation Of Breather Cap; Movement Check; Adjustmenting The Thrust Force (By-Pass Valves); Adjusting The Hydraulic Slowing-Down In Closing - Aprimatic FORTY 5500 Serie Instructions D'installation Éléctrique, D'utilisation Et D'entretien

Opérateur oléodynamique à 230 v pour portails battants
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

OPERATOR FOR SWING GATES
3.1

Installation of breather cap

Unscrew the red cap installed by the factory and replace it with
the breather cap, supplied in the accessory pack (
3.2

Movement check

When installation is complete, release the operator, move
the gate slowly and smoothly by hand to check for fl uid
movement. - Open and close the wing and check that
there is no friction on the operator or contact between the
operator and wing or pillar. - Verify the opening angle.
When you have completed these checks, close the gate,
!
re-lock the operator and restore the mechanical connection.
3.3
Adjustmenting the thrust force
When mechanical installation is complete, make the
electrical connections by following the
supplied for the control unit and ancillary equipments
installed.
Start up the operator and check the gate thrust force.
With the gate in motion, make the adjustments in the
opening and closing, by turning the adjusting screws with
a screwdriver as shown in
The opening thrust force of the wing should be set
!
slightly higher than the closing thrust force.
Repeat the operations of checking and adjusting until the
obtained thrust force complies to the regulations.
WARNING
The calibration value must be established on the site once
installation has taken place and must comply with the
existing Safety current standard (in Europe: EN 12445).
If the forces required to move the gate are higher than
standard limits, it is necessary to install a safety device
in accordance with the EN 12978 standard.
3.4
Adjusting the
hydraulic slowing-down in closing
The operator supplied by factory is with brake disabled.
!
Retract the rod inside the operator by using the manual
release or by powering the gate opening.
Fully tighten the slow-down adjusting screw (clockwise).
Power the gate closing (rod extension) for a longer time
than the one necessary to complete the maneuver. The
movement stops due to the action of the brake.
Unscrew the slow-down adjusting screw, slowly, for max.
4 complete turns, until the moving starts again; adjust by
rotating the screw a half-turn more or less.
3.5
Adjusting the
hydraulic slowing-down in opening
Do the same on the ope
slow-down adjusting screw.
3.6

Concluding the installation

ASSEMBLING THE RELEASE UNIT
Position the release unit and fi x it with the 2 relevant
screws (
fi g.13-ref.E).
ASSEMBLING THE AESTHETIC CASING
Position the aesthetic casing and fi x it with the relevant
screw (
fi g.13-ref.F - central hole).
ASSEMBLING THE PROTECTING CASING FOR ROD
AND FRONT COVER
Install the protecting casing for rod and
relevant screws (
fi g.14-ref.G).
Position the front closing cover on the
with the relevant screw (
(BY-PASS valves)
instructions
fi g.12.
ning operation, using the opening
ONLY FOR
VERSION
fi x it with the 2
casing and fi x it
fi g.14-ref.H).
FORTY 5500
fi g. 12 -
Installation of breather black cap - Adjustings
fi g.12).
CLOSING THRUST
OPENING THRUST
-
SLOWING
DOWN IN CLOSING REF
-
SLOWING
DOWN IN OPENING REF
NEVER unscrew the
!
hydraulic slow-down setting
screw completely to prevent
oil leakage.
ADJUSTMENT
- -
+
+
!
fi g. 13 -
Assembling the release unit and aesthetic casing
.
REF
E
fi g. 14 -
Assembling the protecting casing for rod and
front cover
4M
REF
.
REF
H
- 18 -
(
)
.
GOLDEN SCREW
REF
A
(
)
.
SILVER SCREW
REF
B
SCREW CLOCKWISE TO
.
C
COUNTERCLOCKWISE
.
D
Replace the red cap
with the M20 BLACK
breather cap
.
REF
B
.
REF
A
.
REF
D
.
REF
C
.
REF
F
.
G
.
REF
G
-
-
+
+
;
INCREASE
SCREW
TO DECREASE

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Forty 5500-4mForty 5500-7m

Table des Matières