3
INSTALLATION
3.1
AP350 OPERATOR MOUNTING
The AP350 operator
has been made in RIGHT and/or LEFT version depending on the leaf on which it will be installed.
The leaves must be considered from the internal side (garden).
The AP350 operator
is easily installed on any type of gate, as long as the gate is well balanced.
The AP350 operator
has been constructed for gate wings that do not exceed 300 kg in weight and 3,5 meters in
Fix the large plate to the column respecting the measurements shown in the table and position the cylinder perfectly
horizontal (check with a sprit-level) and with respect to Its axis
Fix the gear-motor to the large plate
AP350 OPERATOR MOUNTING Completely extend the stainless steel tube
back for one turn (at least 1 cm) to make the gate wing close perfectly.
Fix the small plate
"4"
to the end of the operator using the pin and grub-screw
wing, keeping the operator horizontal (check with a sprit-level).
Position the mechanical doorstops in both the open and closed positions
MANUAL OR EMERGENCY
TYPE
400
DS41035-002
"1"
using the pin and grub-screw
MANOEUVRE:
Operate unlocking device
ROTATION 95°
W
X
1130
160
(Fig. A).
supplied.
"3"
up to the end of its stroke, then screw it
supplied.
(Fig. B).
"2"
using the key
ROTATION 110°
Y
W
X
210
1130
170
12
length.
Fix the small plate to the gate
supplied.
Y
160
LBT0218