Installation - Aprimatic FORTY 5500 Serie Instructions D'installation Éléctrique, D'utilisation Et D'entretien

Opérateur oléodynamique à 230 v pour portails battants
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.

INSTALLATION

CAUTION! Handle the operator with care during installation.
SECURING THE OPERATOR REAR COUPLING
Position the rear coupling on the basis of the distances
identifi ed previously and secure it to the anchor plate on
pillar, using two weld spots. IMPORTANT : If necessary, cut
the coupling bar to the effective useful length.
During the welding, the anti-vibration bushes must not be
fi tted on the coupling and the hole of the coupling must be
protected.
Use a spirit level to check the vertical and horizontal
!
alignment of the coupling.
Complete the welding process and remove any residue
using a wire brush.
After cooling the parts, protect the
welding zone with rust-proof
PROVISIONAL REAR SECURING OF THE OPERATOR
Insert the fork on the back base of the operator (
secure the fork using the pin (
(
).
C
Insert the two anti-vibration bushes above and below the
coupling (
).
D
Fit the operator on the coupling and secure the parts by
inserting the vertical pin (
pin generously.
Use the nut (
) to secure but do not tighten it fully.
F
FIND THE POSITION OF THE FRONT COUPLING
The gate must be closed.
!
Release the operator and extract the entire length of the
rod, then re-inser it for 5 mm (safety dimension to avoid
the risk of failure).
Relock.
!
To release and relock the operator, use a triangular key
in the seat indicated (
possible insert provisionally the release unit without
secure it (
fi g.12).
Assemble the front coupling (
rod, then secure the components using the Seeger ring
(
).
Grease the parts.
!
H
Position the coupling on the wing. Using a spirit level,
check that the operator is level, then secure the coupling
on the wing using two weld spots.
protect the rod and the ball joint.
Remove the operator from the couplings and complete
the welding of the front coupling.
FINAL SECURING
Reinstall the operator on the rear coupling and
the nut fully (
) to secure the vertical pin (
F
after checking the rod stroke:
and check that the rod protrudes from the operator for the
desired stroke.
Grease generously the ball joint and the relevant
!
securing pin, using graphite grease, then return to put
the ball joint into the front coupling and fi x defi nitely the
parts with Seeger ring (
FORTY 5500
paint.
) and two Seeger rings
B
) in the fork.
Grease the
!
E
fi g.11-PART.1), otherwise it is
) and the ball joint of the
G
During the welding,
!
) in the fork,
E
close the wing completely
!
).
H
OPERATOR FOR SWING GATES
fi g. 9 -
Securing the rear coupling to the pillar
Protect the housing
hole from the welding
residues.
) and
A
fi g. 10 -
Rear securing
B
C
A
fi g. 11 -
Front coupling positioning
tighten
H
G
- 17 -
!
C
E
F
PART.1
!
E X T R A C T T H E E N T I R E
STROKE OF THE ROD
-
RE
INSER IT FOR
D
D
!
,
THEN
5
.
MM

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Forty 5500-4mForty 5500-7m

Table des Matières