6556083.book Seite 17 Dienstag, 22. November 2016 11:30 11
Operating Instructions BA ULTIMATE
65 56 083 D3560.201.10.03.02
4
Preparation
4.1
Initial start-up and longer breaks in use
✔ The turbine is only able to reach full power if indicated operating
Turbine
pressures are set [ → 13]. If necessary have the pressures checked
by a service engineer with a star tester that is placed between the
supply hose and the quick coupling.
➢ Sterilize the turbine and accessory parts prior to startup.
➢ Clean and maintain the turbine after longer breaks in use.
4.2
Prior to starting the work day
➢ Purge the water and air channels for 30 seconds.
4 Preparation
17