Preparation; Initial Start-Up And Longer Breaks In Use; Prior To Starting The Work Day - B.A. International BA 695 Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 76
6556083.book Seite 17 Dienstag, 22. November 2016 11:30 11
Operating Instructions BA ULTIMATE
65 56 083 D3560.201.10.03.02
4

Preparation

4.1

Initial start-up and longer breaks in use

✔ The turbine is only able to reach full power if indicated operating
Turbine
pressures are set [ → 13]. If necessary have the pressures checked
by a service engineer with a star tester that is placed between the
supply hose and the quick coupling.
➢ Sterilize the turbine and accessory parts prior to startup.
➢ Clean and maintain the turbine after longer breaks in use.
4.2

Prior to starting the work day

➢ Purge the water and air channels for 30 seconds.
4 Preparation
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ba 695fbaBa 888fm

Table des Matières