INSTALLATIoN
Preparation
9.
Preparation
9.1
Installation location
Material losses
!
Never install the appliance in wet rooms.
Install the appliance near the draw-off point in a dry room free
from the risk of frost. To reduce line losses, keep the distance short
between the appliance and the heat pump.
Ensure the floor has sufficient load bearing capacity and evenness
(for weight, see chapter "Specification / Data table").
The room must not be subject to a risk of explosions arising from
dust, gases or vapours.
If you are installing the appliance in a boiler room together with
other heating equipment, ensure that the operation of the other
heating equipment will not be impaired.
Minimum clearances
≥500
≥100
The minimum side clearances can be swapped between left and
right.
26
| HSBC 200 L
≥100
≥500
9.2
Transport and handling
Material losses
!
Store and transport the appliance at temperatures be-
tween -20 °C and +60 °C.
Handling
f Undo the 4 screws from the non-returnable pallet.
f
f Tilt the appliance and screw the 4 adjustable feet into the
f
appliance.
f Lift the appliance off the pallet.
f
If narrow doors or hallways hinder handling, you can separate
the upper and lower sections of the appliance as described in the
following chapters.
9.2.1 Removing / fitting the front casing
f Remove the screw at the top in the middle of the appliance.
f
f Unhook the front casing towards the top.
f
f Fit the front casing in reverse order.
f
www.stiebel-eltron.com