Fisher & Paykel AeroCare Instructions D'installation Et Guide D'utilisation page 20

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation instructions
CA
18
(EN)
Connecting to supply
Apply pipe
compound to
all male threads
Fig.10 Connecting supply
Important!
Do not over tighten the connections.
Test for gas leaks
NEVER use an open flame to test for gas leaks.
Turn on the gas (open the gas shut off valve).
All connections should be checked for leaks with a soapy, or equivalent solution. Apply a soap
(or equivalent) solution to the connection points. If leaks are found, close the shut-off valve,
re-tighten the joint, then repeat the test.
Note: Do not use a solution that contains ammonia. This may cause damage to the brass fittings.
Open gas valve
Fig.12 Testing for gas leaks
Plugged
Tapping
Shut off valve
Fig.11 Tightening supply connections
WARNING!
Using two adjustable
wrenches tighten all
connections

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Aerocare serie

Table des Matières